Case study 1, multiple-family dwelling in Berlin

This facility is located on a multiple-family dwelling of a residential real estate developer in Berlin

The course of construction:
Beginning of construction May 22, 2013

100 1351

Freitag den 05.07.2013 ist die PV-Anlage ans Netz gegangen.
Reine Bauzeit nur ca. 6 Tage.

thumb 100 1400

 Location:

 Schlunkendorf / Brandenburg

 Panels:

 36 x 220 Watt SunPower

 Inverters

 IGPLUS 100, Fronius

 Power:

 7,920 kWp

 Commissioning:

 July 2009

 Orientation

 South

Datenloger: >>>Link


Advantages

  • Reduces the consumption of non-renewable energy by about 7.500 kWh/year
  • Rapidly installed: max. three days for the complete solar plant
  • Produces 300% of the annual electrical needs of a family with clean, environmentally-friendly energy
  • Short amortization of investment through continually increasing energy costs
  • More independence